Sept 15, 2015

We are excited to announce the latest version 7.0 of our WPF and Silverlight Gantt Packages. This latest version includes a list of long awaited features like “Task level Schedules” that you have been eagerly waiting for.

  • Support for Task Level Schedules in Project Gantt.
  • Improved printing in WPF to print large number of tasks.
  • Support for dependency line rerouting (when a task is collapsed out of view) in Resource Gantt.
  • Improved, full dependency line rendering when virtualized.
  • Auto Scrolling and Auto Paging while moving and resizing the task bars.
  • Support for deferred scrolling (ScrollViewer.IsDeferredScrollingEnabled) in the grid, to enable faster scrolling in WPF.
  • EndTimeBinding for tracking endtimes in data sources and to improve load time perf.
  • Rendering the FlexyGantt tasks resized to fit the schedule of that row, when showing the day header.
  • Support for MS Project calendars with exceptions.
  • Ability to hide columns while printing.
  • FlexyTable.BeforeExpand event to implement load-on-demand scenarios.
  • Project gantt task bar rendering based on assigned resource (if there is a single resource assigned).
  • Optionally render row-borders in chart in WPF.
  • Support for showing a single time line header when time line headers are managed by GanttChartTimeScaleHeaderSettings.
  • Popup while dragging bars across rows in FlexyGantt.

We are sure you will find these new features a must-have and adopt right away. And we appreciate your continued patronage of our products.

All licensed customers will be notified of the download to the new version.

If you are new to our products, please download the Trial here. If you already hold a license and you don’t have the download link please contact our support mailbox to get your licensed copy.

Thanks for your continued patronage.

RadiantQ Team